Ceasars Windsor Hotel Expansion and Retrofit

Our largest hospitality project with a present-day value of $525 Million.
West Block: Eastern acted as the Construction Manager for the new 28-storey, 386 suite hotel tower with pool and spa on the top floor roof. The facility included a three-level underground valet parking garage for 3,000 cars was constructed at a cost of $80 million, in addition to a 50,000 sq ft on-grade 5,000-seat concert venue. Located above the concert hall facility is a 25,000 sq ft ballroom along with conference facilities. The West block is linked to the existing North Block by a structure bridging over the existing dividing road, McDougall Avenue. The bridging section acts as the main entrance and houses the new central front desk/reception.
North Block: The existing North Block was extensively renovated to include several new bars and restaurants, an expanded new buffet, retail space and a new re-branding of the entire facility including the gaming floors. Of particular note was the buffet; built at a cost of $20 million, the project was completed over a four-month period and commenced operations on schedule, in time for the Super Bowl.
Highlights
- CCDC-5B Contract
- Renovations and new construction
- 5,000-seat entertainment facility
- 3-storey underground valet parking
- Ballroom, office and conference facilities
- New bars and restaurants
- Pool and spa facility on the top floor roof
- Gaming floors
- Innovation areas