Virtual Design & Construction / Building Information Modelling
Eastern continually advances how projects are delivered, utilizing the latest Building Information Modeling and Virtual Design and Construction technologies to optimize schedule, mitigating risks, and empower better decision-making throughout all phases of construction.

Digital approach
At Eastern, we harness the power of Virtual Design and Construction (VDC) and advanced Building Information Modeling (BIM) to bring clarity, accuracy, and confidence to every stage of a project. Our technical expertise and digital-first approach ensure that project teams and partners can rely on coordinated, data-driven insights from start to finish. Our commitment to innovation and continuous improvement enables us to visualize, analyze, and resolve complex challenges early in the process. By integrating VDC into key project milestones, we support smarter decision-making that leads to leaner workflows, safer construction environments, and high-quality, cost-effective project outcomes.
Our Workflow

3D coordination & cash detection
Our team leads and manages a comprehensive multidisciplinary 3D coordination process that enables early identification and resolution of potential conflicts before construction begins. Each trade partner develops its 3D model for coordination and installation purposes in alignment with the required Level of Development (LOD) and project BIM standards. This proactive approach minimizes rework, enhances constructability, and improves communication among all project stakeholders.

4D simulation & construction sequencing
Utilizing a 3D model, our team integrates schedule data to develop detailed 4D simulations that visualize the construction sequence over time. This powerful tool allows stakeholders to clearly understand project phasing, logistics, and site constraints. By simulating construction activities, we can identify potential schedule conflicts and optimize workflows, helping the entire project team make informed decisions and maintain project momentum from start to finish.

Drone & aerial data capture
Our team leverages drone technology to efficiently survey large project sites and capture high-resolution imagery with point cloud data. 3D mapping provides valuable insights into existing conditions, terrain, and progress tracking. By generating 3D maps, we can monitor construction progress, verify as-built conditions, calculate stockpile volumes, and document each project phase with precision.

Reality Capture & Laser Scanning
At Eastern, we rely on reality capture and laser scanning to accurately document existing conditions, especially when working with heritage buildings. Using LiDAR technology, we create detailed 3D point cloud models that integrate directly with our VDC process. This allows our team to plan and coordinate around existing structures with high precision. Laser scanning is also used for quality control and as-built purposes.

Facility Management Model
Our team can deliver BIM models built for long-term facility management, complete with COBie-compliant data. By embedding asset data, maintenance history, and operational details during construction, providing owners with a single, reliable, source of reference. This ensures a smooth handover, reduces redundant data collection, and helps facility teams operate and maintain the building efficiently.

Expert Services
Eastern’s team of experts is recognized for a collaborative and humble approach at every phase of construction, supported by meticulous attention to detail. We bring proven strength in mass timber, sustainability and low-carbon construction, strategic procurement and subcontractor relationships, safety management, quality management and deficiency control, as well as Virtual Design Construction & Building Information Modelling.

Preconstruction Services
Eastern delivers successful projects through strong leadership and a highly collaborative culture that brings out the best contributions from every stakeholder. We get involved early in preconstruction to understand our clients’ aspirations and vision, to develop strategies that protect key design features while finding smart economies elsewhere. This collaborative approach helps us meet schedule and budget targets while delivering high-quality facilities.

Construction Phase
Eastern takes a cooperative leadership role on every project, coordinating the full team on behalf of the owner. We balance the perspectives of the owner and design partners while managing schedule and budget, and we provide early input on constructability, phasing, schedule and cost control, and risk management to set the project up for long-term success.

Post Construction Phase
Eastern understands that project close out can be challenging, which is why we start early, monitor progress closely, and stay committed through to final completion. Drawing on experience from thousands of successfully closed projects, we focus on making the post-construction and substantial performance phases efficient, orderly, and as seamless as possible for everyone involved.

Start your journey with Eastern Construction
We’re passionate about giving back! Our teams frequently volunteer, fundraise, and support community causes — from autism awareness to youth mentorship and local charity builds. It’s our way of putting our Can-Do Attitude into action beyond the job site.



























